Test Success Story

test SUB TITLE

test lead text

PP-N19A006-Teretek®-Remediates-Sydney-Harbour-Seawall-Jan-2021.pdf

Test Application Block

Test Content 1

Test Application Block 2

Test 2

seaview wastewater treatment plant getting treated by Mainmark's Terefirm

Test Application Block 3

test 3

Test Benefit Block

Features

Benefits

Benefit 1

Test Benefit 1
Test Benefit 2
Test Benefit 3
Test Benefit 4

Test Benefit 2

Test Benefit 1
Test Benefit 2
Test Benefit 3
Test Benefit 4

Test Testimonial Block

“We really enjoyed working with you. It was a very well managed project where all aspects of work were timely coordinated. Your onsite team was delight to work with. Thanks for excellent customer service.”

Abdus, Rockhampton, QLD. May 2017

“Thank you again for the terrific service provided by Uretek through D___ and his team headed by A___.”

Airini, Auckland, NZ. July 2014

“We are delighted with the work done on Tuesday, amazing to hear our house creaking as it moved upwards. The cracks in the walls, ceilings and cornices have closed, our internal doors now stay open without having to wedge them. The three young men, P___, C___ and L___, were hard-working, professional, polite and friendly.”

Alan & Maria, Kanahooka, NSW. October 2017
Read more

Test Tab Heading

Test tab 1.1

Test tab 2

Test tab 2.1

Seaview wastewater treatment plant

tab 3

Test tab 3.1

Test Numbers Block

1

Test Number Block 1

2

Test Number Block 2

3

Test Number Block 3

4

Test Number Block 4

Problems we solve

Icon2_Cracked Walls

Cracked Walls

Solutions for structural damage due to sinking foundations

Icon1_Sinking Floors

Sinking Floors

Solutions for building subsidence

Icon3_Unlevel Buildings

Unlevel Buildings

Solutions for weak ground and subsidence

Icon4_Ground Instability

Subsidence

Solutions for shifting ground and ground instability

Icon5_HolesVoids

Holes and Voids

Solutions for cracks, crevices and large voids

Icon6_EarthquakeDamage

Earthquake Damage

Solutions for liquefaction mitigation and ground strengthening

Test Image Link

kaimai rail tunnel



Test Image link block content

General content : Test Heading

Test Subhead

Test Lead Text

For Testing Purrposes Only : After advancing to required depth,the monitor is rotated as it is withdrawn. Simultaneous water-jetting and slurry-jetting hydraulically erodes, mixes and partially replaces the soil with cementitious slurry, to create engineered ‘soil-crete’ of high strength and low hydraulic conductivity. Jet Grouting can be performed to great depths, around obstructions, such as underground piping, above or below the water table and in a variety of soil conditions, from plastic clays to silts and non-cohesive soils (where they are most effective). ‘Soil-crete pillars’ can be created as much as 7 metres in diameter and 60 metres deep. Strengths up to 115,000 kN can be achieved. These columns are all created through small holes of only 200mm in diameter. We use a range of machines from man-portable, small 100kg machines up to very large ones.

  • The smallest machines can create columns up to 20m deep and 3.5m Ø, with strengths up to 28,000kN (ucs).
  • Mid size machines can produce columns up to 25m deep and 3.5m Ø, and 28.000kN.
  • The largest: up to 160m deep, 7m Ø and 15,000kN.

There is no excavation. The penetrations for drill stems are only 200mm Ø. The cement slurry is delivered to the jet grouting machine by pipe from a mixing unit-hopper outside the building. Excess water and slurry coming back out of the ground is automatically drawn off in large diameter hoses from the drill stem holes and delivered to waste disposal skips.